September 2013 Maritime Reporter | April 2013 Marine Technology | March 2011 Oil and Gas Journal | February 2009 Oil and Gas Journal | May 2008 Oil and Gas Journal | May 2006 Maritime Technology Reporter | August 2003 Maritime Reporter | June 11, 2001 Oil and Gas Journal | June 2001 Maritime Reporter | May 1998 Offshore Magazine ![]() ![]() August
2003 Maritime Reporter and Engineering News OUTLOOK
FOR FLOATING PRODUCTION SYSTEMS
by
James R. McCaul, President
International Maritime Associates, Inc.
Floating production has evolved to a mature
technology that opens for development oil and gas reservoirs that would be
otherwise impossible or uneconomic to tap. The technology enables production far beyond the depth constraints of
fixed platforms, generally considered to be 1,400 feet, and provides a flexible
solution for developing short-lived fields with marginal reserves and fields in
remote locations where installation of a fixed facility would be difficult.
Types of
Floaters — Floating
production systems vary greatly in appearance — from ship-shape FPSO vessels to
multi hull production semis to cylindrical shaped production spars. But common to all is machinery and equipment
to lift oil and gas from seabed wells and perform initial processing of the raw
production. Here’s a brief rundown of
the systems in operation.
FPSO vessels — 89 FPSOs are in service, another 24 on order. 14 of the units on order are purpose built
hulls, 10 are conversions of vintage tankers, mostly VLCCs. FPSOs are found in all offshore areas where
floating production is used — with the notable exception of the Gulf of Mexico
where FPSOs have still not been employed. The largest presence of FPSOs is in the North Sea and off Africa. 19 units are now operating in each
area. They range in size from 50,000
bbl tankers with capability to process 10,000 to 15,000 b/d — to VLCC size units
able to process more than 200,000 b/d and store 2 million barrels (e.g., the
Bonga FPSO off Nigeria will be able to produce 225,000 b/d).
Some are held in place with
a simple spread mooring system, some are fitted with a turret system that
allows the vessel to weathervane. A few
small units are held in place by dynamic positioning. The choice of mooring system depends on local weather and sea
conditions. As many as 60 to 70 subsea
wells can be tied back to the production unit (e.g., Dalia FPSO off Angola will
be tied to 67 wells through 9 manifolds) or the unit could be producing from
only one well. Off-take and delivery of
oil is accomplished using shuttle tankers, typically using tandem stern loading
on weathervaning units and transfer via CALM buoy on spread moored units, with
tandem loading usually provided as backup.
Cost of FPSOs varies
greatly. Capital expenditure for a high
production purpose built FPSO for a large field offshore Africa can exceed $700
million, with the hull costing $100 to 120 million, the topsides $500 to 600 million. The Girassol FPSO, now operating off Angola,
cost $756 million. The hull cost $150
million, topsides $520 million and project management and delivery comprised
the balance. A more recent project, the
Erha FPSO being built for offshore Nigeria, carries a total contract price of
$700 million, with the hull costing $110 million, topsides and delivery the
balance. At the other extreme, an FPSO for
a marginal field utilizing a second hand tanker and fitted with a 50,000 b/d
plant could entail a capex of one tenth this amount. The operator of the Okwori field off Nigeria is planning to use
an FPSO for production, but only if total capex for development is within $120
million. An FPSO operating offshore
Libya since 2001 began producing on the field for a capital expenditure of $55
million, with conversion and topsides plant installation done at Malta
Drydocks.
Hull and topsides contracts
are sometimes awarded separately, sometimes awarded as a single contract. Sometimes the bidders are given the choice
of taking the whole thing or just a portion. The upcoming competition for the Akpo FPSO contract will divide work
into three packages — hull, topsides and project management — and bidders will
have the choice of bidding one, two or three work packages.
FPSO fabrication and
conversion contracts have become the province of Asian yards. Samsung and Hyundai are the big players in high
end FPSO fabrication (e.g., units for Kizomba, Dalia, White Rose, etc). Dalian and Shanghai Waigaoqiao have been
making inroads on low end projects (e.g., Belanak, Caofeidian, Panyu FPSOs). Almost all recent FPSO conversion work has
been captured by Keppel, Jurong, Dubai Drydocks and MSE.
Production semis — 38 production semis are in service, 3 more on order. Brazil, where the concept of using converted
drill semis for production originated, accounts for 19 of the units now in
service. The North Sea is the other
area where a large number of production semis are in service, with 12 units now
operating. Until now there has been
little use of production semis in the Gulf of Mexico. An early version, Garden Banks, was removed from operation
several years ago. But this production
concept has again found appeal among Gulf field operators. A production semi (NaKika) is now being
installed in the Gulf and two more (Atlantis and Thunder Horse) will begin
operating in the Gulf within the next two years.
Production semis vary greatly
in size and complexity. Some older
units offshore Brazil, Africa and Southeast Asia have capability to produce
only 10,000 to 25,000 b/d of oil. At
the other extreme, the Thunder Horse production semi will have processing
capacity for 250,000 b/d and an existing unit in the North Sea, the Asgard B,
can produce 130,000 b/d condensate and 1300 MMcf/d gas.
Some of the larger systems
have tie backs from more than 20 wells. Thunder Horse will be tied to 25 wells initially. As there is no storage on the production
unit, either a separate floating storage unit is employed on the field for
storage and offloading or pipeline off-take direct to shore is utilized. Most production semis utilize the latter. Because of motion at the surface, well
control devices are fitted at the ocean floor and fluids are brought to the
surface via flexible or steel risers. However, Shell’s new NaKika production semi in the Gulf of Mexico will
utilize dry trees for some wells — i.e., well control devices will be on the
topsides for easy maintenance.
The days of taking a surplus
drill rig and converting it at minimal cost to a production semi are gone. Candidate surplus hulls are no longer
available. The units now being built
are very expensive things. A purpose
built production semi intended for use on a complex field will cost $500 to 900
million, depending on the plant capacity and gas producing capability. The Kristin production semi, now being built
for use off Norway, entails capital expenditure of $860 million for hull and
topsides. The Thunder Horse semi hull
is a $300 million fabrication job. The
hull and topsides for NaKika cost $600 to 650 million.
Three major Korean yards are
the big players in this sector. Hyundai
had entire contacting responsibility on the NaKika production semi. Daewoo is building the hulls for the Thunder
Horse and Atlantis semis, with McDermott supplying the topsides. Samsung is fabricating the Kristin
production semi hull, Aker Stord is supplying the topsides.
Production spars — 7 production spars are in service, 6 on order. All are in the Gulf of Mexico. This type of production system has not found
favor elsewhere, at least to date. These
are purpose built cylindrical shape units supporting a topside deck fitted with
capability to process 25,000 to 100,000 b/d. The largest unit is ExxonMobil’s Hoover/Diana spar, which has ability to
produce 100,000 b/d oil and 325 MMcf/d gas. The smallest unit is Neptune, the original spar deployed in the Gulf of
Mexico in 1997, which can process 25,000 b/d. A new unit under construction, Red Hawk, is a small spar designed for
gas production.
Weight bearing capability is
less than the previous two production systems and spars would generally be used
on mid-size fields. Storage could be
provided in the hull — but spars built to date have no storage. Spars are widely used in the Gulf of Mexico,
as pipeline infrastructure in the Gulf to date has eliminated the need for
storage on the field. Also, spars are
stable platforms that allow well control devices to be placed on the topsides. Operators in the Gulf find this important as
it reduces maintenance costs associated with high paraffin oil.
A heavy deckload spar such
as Hoover/Diana will entail a capital expenditure of $300 to 500 million. Smaller spars such as Devils Tower will have
a capex in the $200 million area. Light
deckload spars like Red Hawk will cost in the $100 million area.
Hull cylinder fabrication
has been largely the province of Technip, using its facility in Finland. Hulls for 6 of the 7 spars in service have
been fabricated in Finland and 3 more are on order there. But McDermott has taken 3 spar hull contracts
using the company’s fabrication facilities in the UAE and Indonesia, a venture
that has not worked out too well, and a recent order for a small spar hull went
to Gulf Marine in Texas. Spar topsides
fabrication has been almost totally the province of McDermott,.
Tension leg platforms — TLPs come in three variations — large deckload,
mini and wellhead. Altogether, there
are 15 TLPs in service (9 full size, 5 minis, 1 wellhead) and 4 on order (2
minis, 2 wellhead).
The original full size
version is a large expensive unit capable of supporting a high throughput
processing plant. The Snorre TLP,
operating in the North Sea, holds the current TLP plant capacity record, with
capability to process 190,000 b/d oil and 113 MMcf/d gas). Two full size TLPs are operating in the
North Sea, 7 in the Gulf of Mexico. Because
heave motion of the floater is restrained by tendon tension, well control
devices can be installed on the topsides, making maintenance easier. The ability to use dry trees has
historically been a major reason for choosing this type production system. But full size TLPs have fallen out of favor
due to their high cost and inability to be used in very deep water. Tendon weight becomes a major issue as the
water depth increases beyond 1200 meters.
Now interest has shifted to
mini-TLPs designed for mid-size deepwater fields. They are smaller, lighter and able to support a processing plant
up to 50,000 to 60,000 b/d. But unlike
their big brothers, they are able to be used in very deep water. The Magnolia mini-TLP, now on order, will be
placed in 1430 meters water depth. Modec
and IHC Caland are marketing mini-TLP designs, 5 of which have been installed
and 2 more are on order.
Using TLPs as wellhead
platforms has also recently gained favor. The TLP is fitted with machinery to control well production and the oil
processing plant is placed on an accompanying production unit. ExxonMobil is utilizing a combination
wellhead/FPSO production system on its massive Kizomba A and B developments
offshore Angola. A smaller wellhead
TLP/production barge combination is now being installed on the West Seno field off
Indonesia.
Capex for a large wellhead TLP will likely be in the
range of $500 to 600 million. The Kizomba A
wellhead TLP cost $650 million, but this is an exceptionally large and complex
field and the cost will probably come down as additional units are built. Capex for a small wellhead TLP will likely
be in the range of $80 to 100 million. The West Seno wellhead TLP/production barge combination cost $265
million, of which the TLP probably accounted for two-thirds. Mini-TLPs cost about $150 to 250 million,
depending on the capacity of the production facility placed on deck.
Samsung and Daewoo are the big players in TLP hull
fabrication. Samsung is fabricating the
Marco Polo and Magnolia hulls, Daewoo has the contract to supply the wellhead
TLPs for Kizomba A and B. Hyundai is
also in this market, having fabricated the small wellhead TLP for West Seno and
is in line for the second unit on this field. This is a lot different than the old days, when Belleli basically
controlled TLP hull fabrication. Topsides fabrication for Gulf of Mexico units has been going to
McDermott, Gulf Marine or Kiewit Offshore. ABB/Heerema has a role in topsides engineering and fabrication for
the wellhead TLPs off Africa.
Future Floater
Orders — In
a recent study, we identified 94 offshore projects that have strong likelihood
to utilize a floating production system should they move to the production
stage. West Africa is the clear leader
in terms of potential projects, with 12 projects in the bidding or final design
stage and another 14 in the planning phase. The Gulf of Mexico is second, with 17 projects planned or under study. In third place is Brazil with 15 projects,
followed by Southeast Asia with 12, Australia with 8 and Northern Europe with 6
projects.
Based on our analysis of projects being planned, we
see a requirement for 245 to 270 floating production systems by the end of the
decade. Taking into account (1) the number of units currently in
operation, (2) the number of units
now on order and (3) the likely
scrapping and loss rate, we see a need to order 62 to 89 additional floaters
over the next five years to meet this requirement.
Of this total, we expect 60 percent will be FPSO
vessels, 30 percent spars or TLPs and 10 percent production semis. We also project that the mixture of floater
orders will produce a capex value of $22 to 31 billion over the five year
forecast period.
* * * * * *
International
Maritime Associates (IMA) was formed in 1973 to provide strategic planning
support to clients in the offshore oil and gas, maritime and technology
sectors. IMA performs the research
needed to size the available market, analyze customer requirements, assess
competitor strengths/ vulnerabilities and evaluate options for optimizing
market position.